Extensive DDC system upgrades to 3 buildings and total controls system replacements at 3 additional buildings
1 chiller and 1 boiler replaced with a new highly efficient system
20 high-efficiency rooftop units installed, including fuel conversion from electric to natural gas heating
VRF system renovation
89 VAV terminal units installed, including the replacement of constant volume with variable volume systems
New interior LED fixtures and retrofits including occupancy sensor controls
New exterior LED fixtures with bi-level motion sensing technology
Computer power management for over 1,400 campus computers
Utility rate savings resulting in more than $69,000 in annual savings
Somerset CC energy usage
[CMTA’s] work during these past two years has been flawless, their recommendations included many items and demonstrated the strength and savings associated with each....the final implementation was a true collaborative effort that prioritized the best path forward for the College.
Larry Abbott, Vice President of Operations
Somerset Community & Technical College, Somerset, Kentucky
Related Work
Renovations That Pay For Themselves, Guaranteed
This was the smoothest construction project I can remember during my tenure at KEC. The project was ahead of all issues before they became problems, this was a great benefit to the Operations Department.
Our project replaced multiple systems at the end of their life, as well as resolving many of the control issues that we were experiencing throughout our college. CMTA has been a valuable asset after the project as well, through the review of our data. Their reviews have provided additional savings.