Extensive DDC system upgrades for two buildings and total controls replacements for five buildings
One chiller and one boiler were replaced with new high-efficiency equipment
Boiler/fluid cooler water source heat pump system renovation with energy recovery ventilator installation for improved ventilation
New interior LED fixtures and retrofits, including occupancy sensor control
New exterior LED fixtures with bi-level motion sensing technology
Computer power management for over 1,400 campus computers
No cost/low cost utility rate savings resulting in more than $59,000 in annual savings
Southcentral Community College
In over 15 years of campus projects, I hold CMTA at the top of the partners with which we have worked. They bring not only experience and an excellent technical skill set to the table, but a very high level of professionalism.
Chris Cumens, Vice President of Finance & Administration