This project was a Guaranteed Energy Savings Contract that included 9 facilities, over 506,778 square feet, in the Mercer County School District.
The scope included:
- Fully renovated HVAC system at King Middle School with a hybrid variable refrigerant flow unit and boiler/chiller system
- Fully renovated HVAC system at Mercer Intermediate School with a boiler/tower water source heat pump system
- All control systems within the district were brought into a new web-based DDC system
- All light fixtures across the district were changed to LED fixtures. Kitchen refrigeration equipment was replaced at the Elementary and Middle Schools