This project in Pontotoc, Mississippi is a Guaranteed Energy Savings Contract that includes 7 facilities, over 386,568 square feet.
The phase 1 project scope included:
- New building controls and new hot water boiler for Pontotoc High School
- New hot water control valves and variable speed drives for pumps at Pontotoc High School
- New backup generator for the Administration Building
- HVAC system replacements for auditorium in Pontotoc Junior High School
- New AHUs, AHU controls, boiler controls, feedwater heater, and steam traps for the Pontotoc Junior High School
- Recommissioning the cafeteria AHU unit in the Pontotoc Middle School
- New LED lighting retrofits and replacements for 7 schools
- Motion sensing thermostats for 5 schools
- New code-compliant kitchen cooking hood for D.T. Cox Elementary School
The phase 2 project scope included:
- new rooftop unit for the Pontotoc Middle School auditorium
- HVAC renovation, including new energy recovery ventilator, new split system heat pump and condensing unit, and 9 electric unit heaters for the Junior High School gymnasium basement
- for the High School Band Hall, a new rooftop unit for a second floor classroom