This project was a Guaranteed Energy Savings Contract that included six facilities in the Sycamore Community School District, located in Cincinnati, Ohio. With a total cost of $4,080,200 and a 14 year term, the project is guaranteed to save 3,092,881 kWh, 13,966 KW, and 23,345 ccf of natural gas. 

The scope included:

  • Replacement of 16-year-old equipment, including 60-ton chillers replaced with new 70-ton chillers and hot water boilers replaced with new condensing boilers and primary pumps, for Blue Ash Elementary School, as well as replacing the chillers at Montgomery Elementary School
  • 2 new boilers, a replacement 500-ton water-cooled chiller, and replacement primary chilled water and condenser water pumps were installed in Sycamore Community High School
  • Demand limiting and controls optimization for 9 facilities, reworking the existing piping onsite and installing ice production pumps and control valves, as well as putting a 3-tier demand reduction sequence in place
  • Replacement of 1000-gallon, 180 kW electric domestic water heater, as well as an installation of 2 new 120-gallon, 18 kW electric heaters, at the Gregory Center 
  • New interior and exterior LED lighting upgrades

Sycamore Community Schools

[{"x":"JAN","Baseline":"881549.0","Guaranteed":"674407.0","Actual":"794704.0"},{"x":"FEB","Baseline":"1964588.0","Guaranteed":"1486057.0","Actual":"1581949.0"},{"x":"MAR","Baseline":"3333741.0","Guaranteed":"2495287.0","Actual":"2489548.0"},{"x":"APR","Baseline":"4665785.0","Guaranteed":"3477089.0","Actual":"3410868.0"},{"x":"MAY","Baseline":"5805721.0","Guaranteed":"4328530.0","Actual":"4098917.0"},{"x":"JUN","Baseline":"6813697.0","Guaranteed":"5095332.0","Actual":"4864640.0"},{"x":"JUL","Baseline":"7870805.0","Guaranteed":"5095332.0","Actual":"5702008.0"},{"x":"AUG","Baseline":"8918415.0","Guaranteed":"6719331.0","Actual":"6447482.0"},{"x":"SEP","Baseline":"9919217.0","Guaranteed":"7498751.0","Actual":"7106651.0"},{"x":"OCT","Baseline":"10931046.0","Guaranteed":"8285484.0","Actual":"7755363.0"},{"x":"NOV","Baseline":"12002112.0","Guaranteed":"9116798.0","Actual":"8565607.0"},{"x":"DEC","Baseline":"12909309.0","Guaranteed":"9816429.0","Actual":"9408421.0"}]
What does this data mean?
Baseline: The annual energy consumption before the project
Guaranteed: CMTA's guaranteed energy use for the client post-project
Actual: The measured energy use after the project